{"id":8760,"date":"2025-06-10T01:28:14","date_gmt":"2025-06-09T23:28:14","guid":{"rendered":"https:\/\/dreamdim.ua\/uk\/?p=8760"},"modified":"2025-08-09T20:50:48","modified_gmt":"2025-08-09T18:50:48","slug":"budivelnyj-pasport-2025","status":"publish","type":"post","link":"https:\/\/dreamdim.ua\/en\/budivelnyj-pasport-2025\/","title":{"rendered":"Building Passport for Land Plot Development in 2025"},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/dreamdim.ua\/wp-content\/uploads\/2025\/06\/DREAMDIM_BP_2025_en-1024x576.png\" alt=\"\" class=\"wp-image-8822\" srcset=\"https:\/\/dreamdim.ua\/wp-content\/uploads\/2025\/06\/DREAMDIM_BP_2025_en-1024x576.png 1024w, https:\/\/dreamdim.ua\/wp-content\/uploads\/2025\/06\/DREAMDIM_BP_2025_en-300x169.png 300w, https:\/\/dreamdim.ua\/wp-content\/uploads\/2025\/06\/DREAMDIM_BP_2025_en-768x432.png 768w, https:\/\/dreamdim.ua\/wp-content\/uploads\/2025\/06\/DREAMDIM_BP_2025_en.png 1200w\" sizes=\"auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px\" \/><\/figure>\n\n\n\n<p>Anyone planning to build a private house\u2014whether a homestead, garden, or summer house\u2014inevitably asks: what is required to start construction and ensure everything is done legally?<\/p>\n\n\n\n<p>If the total area of your planned house does not exceed <strong>500 square meters<\/strong>, and the building will not be taller than <strong>two stories and an attic<\/strong>, then you may legally proceed with the project by obtaining a <strong>Building Passport<\/strong> (\u0431\u0443\u0434\u0456\u0432\u0435\u043b\u044c\u043d\u0438\u0439 \u043f\u0430\u0441\u043f\u043e\u0440\u0442) or a <strong><a href=\"https:\/\/dreamdim.ua\/uk\/shema-namiriv-zabudovy-chy-budivelnyj-pasport-shho-obraty-v-2025\/\" title=\"\">Development Intent Scheme<\/a><\/strong> (\u0441\u0445\u0435\u043c\u0430 \u043d\u0430\u043c\u0456\u0440\u0456\u0432 \u0437\u0430\u0431\u0443\u0434\u043e\u0432\u0438).<\/p>\n\n\n\n<p>Both of these documents entitle you to submit a <strong>notice of commencement of construction works<\/strong>, granting you the legal right to build.<\/p>\n\n\n\n<p>In the next article, I\u2019ll explain <strong><a href=\"https:\/\/dreamdim.ua\/uk\/shema-namiriv-zabudovy-chy-budivelnyj-pasport-shho-obraty-v-2025\/\" title=\"\">the key differences between the Building Passport and the Development Intent Scheme, and help you determine which option is better suited for your project.<\/a><\/strong><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>What Is a Building Passport?<\/strong><\/h3>\n\n\n\n<p>A <strong>Building Passport<\/strong> is a document that defines a set of urban planning and architectural requirements for the placement and construction of an individual (homestead) residential house, garden or summer house with a height of no more than two stories (excluding the attic) and a total area of up to <strong>500 square meters<\/strong>. It also applies to the construction of auxiliary structures such as utility buildings, garages, engineering protection elements, landscaping, and greening within the land plot.<\/p>\n\n\n\n<p>A Building Passport can be issued for land plots located in <strong>cities or villages<\/strong>, as well as for those in <strong>garden communities or dacha cooperatives<\/strong> \u2014 the rules for obtaining a building passport are unified across all these categories.<\/p>\n\n\n\n<p>The current form of the building passport, as most people know it today, was introduced in <strong>2011<\/strong>, when the <strong><a href=\"http:\/\/zakon.rada.gov.ua\/laws\/show\/3038-17#n344\" title=\"\">Law of Ukraine \u201cOn Regulation of Urban Planning Activities\u201d<\/a><\/strong> came into force, along with the official <strong><a href=\"https:\/\/zakon.rada.gov.ua\/laws\/show\/z0902-11#Text\" title=\"\">Procedure for Issuing a Building Passport for Land Plot Development<\/a><\/strong>.<\/p>\n\n\n\n<p>Before that, building passports also existed, but their issuance required a <strong>design or sketches signed by an architect<\/strong>, and the passport itself had to be approved not only by the local department of urban planning and architecture but also by <strong>sanitary-epidemiological services<\/strong>, <strong>fire safety authorities<\/strong>, and, in some cases, other agencies.<\/p>\n\n\n\n<p>It is important to note that <strong>both \u201cold\u201d and \u201cnew\u201d building passports are valid indefinitely<\/strong> \u2014 they do not have an expiration date.<\/p>\n\n\n\n<p>Previously, building passports were issued only for houses with a total area of up to <strong>300 square meters<\/strong>. However, starting from <strong>January 1, 2019<\/strong>, amendments to <strong>Article 27 of the Law of Ukraine \u201cOn Regulation of Urban Planning Activities\u201d<\/strong> came into effect, increasing the maximum permitted area of buildings allowed under a building passport from <strong>300 to 500 square meters<\/strong>. Despite this legislative change, for a significant period of time, some departments of urban planning and architecture <strong>continued issuing passports with the outdated 300 m\u00b2 restriction<\/strong>, until corresponding updates were made to the <strong>Procedure for Issuing Building Passports<\/strong>.<\/p>\n\n\n\n<p><a href=\"https:\/\/dreamdim.ua\/uk\/minimalna-ploshha-dilyanky-pid-zhytlovu-zabudovu-5-sotok-minregion-zatverdyv-novi-dbn-pro-planuvannya-ta-zabudovu-terytorij\/\" title=\"\"><strong><em>\u041c\u0456\u043d\u0456\u043c\u0430\u043b\u044c\u043d\u0430 \u043f\u043b\u043e\u0449\u0430 \u0434\u0456\u043b\u044f\u043d\u043a\u0438 \u043f\u0456\u0434 \u0436\u0438\u0442\u043b\u043e\u0432\u0443 \u0437\u0430\u0431\u0443\u0434\u043e\u0432\u0443<\/em><\/strong><\/a><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Procedure for Obtaining a Building Passport<\/strong><\/h3>\n\n\n\n<p>A Building Passport can be obtained <strong>offline<\/strong> through an Administrative Services Center (CNAP) \u2014 either by submitting documents in person or by mail \u2014 or <strong>online<\/strong> via the <strong><a href=\"https:\/\/diia.gov.ua\/\" title=\"\">Diia Portal<\/a><\/strong>.<\/p>\n\n\n\n<p>The passport includes both textual and graphical materials, the most important of which is the <strong>development scheme<\/strong> for the land plot.<br>\u26a0\ufe0f <em>Note: In this article, the term &#8220;development scheme&#8221; refers to the document that is part of the building passport application package. It should not be confused with the \u201cDevelopment Intent Scheme\u201d (a standalone alternative planning document discussed in the next article). To avoid confusion, I will refer to this one as the \u201csite development scheme\u201d going forward.<\/em><\/p>\n\n\n\n<p>The <strong>site development scheme<\/strong> must show all the buildings and structures intended to be constructed on the land plot. Any construction of structures not included in the building passport (and therefore not mentioned in the notification to the State Architectural and Construction Control Authority) will be considered <strong>unauthorized<\/strong>, meaning carried out without the required legal documentation.<\/p>\n\n\n\n<p>In addition to showing the layout of the planned buildings and structures, the site development scheme must also include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>distances to the boundaries of adjacent land plots and nearby structures;<\/li>\n\n\n\n<li>locations of engineering networks and facilities;<\/li>\n\n\n\n<li>building facades and floor plans with overall dimensions;<\/li>\n\n\n\n<li>a list of utility systems (including autonomous ones) to be used;<\/li>\n\n\n\n<li>red lines and development control lines;<\/li>\n\n\n\n<li>vehicle access routes to the buildings and structures;<\/li>\n\n\n\n<li>connection points to utility networks.<\/li>\n<\/ul>\n\n\n\n<p><a href=\"https:\/\/zakon.rada.gov.ua\/laws\/file\/text\/97\/f357506n132.doc\" title=\"\">The <strong>required format of the site development scheme<\/strong> is established by the official <strong>Procedure for Issuing Building Passports<\/strong>.<\/a><\/p>\n\n\n\n<p>As outlined in the regulations, the scheme must contain a substantial amount of detailed information \u2014 much of which the applicant may find difficult or even practically impossible to collect independently. While most of this information is considered <strong>open data<\/strong> and should be <strong>freely available to the public<\/strong>, in reality, this has not always been the case.<\/p>\n\n\n\n<p>Even prior to the full-scale invasion, not all required data was made public. After <strong>February 22, 2022<\/strong>, many public resources were either <strong>restricted or taken offline<\/strong> for security reasons.<\/p>\n\n\n\n<p>As a result, in order to obtain information such as <strong>red lines<\/strong>, the applicant must often submit <strong>formal requests<\/strong> to local <strong>departments of urban planning and architecture<\/strong>.<\/p>\n\n\n\n<p>Additional challenges may arise when trying to determine the <strong>distances to engineering networks<\/strong>, especially <strong>underground utilities<\/strong>, since their locations are not always visibly marked on-site. Although current legislation does not require applicants to commission <strong>topographic and geodetic surveys<\/strong> with utility overlays, I strongly recommend that those planning construction in large cities consider <strong>ordering such a survey<\/strong>, particularly with utility lines shown.<\/p>\n\n\n\n<p>For example, in <strong>Kyiv<\/strong>, obtaining a building passport will typically require a <strong>topographic and geodetic survey<\/strong> that includes both <strong>utility lines and land parcel boundaries<\/strong>.<\/p>\n\n\n\n<p>\ud83d\udccc Until <strong>February 4, 2022<\/strong>, applicants were not required to submit a <strong>site development scheme<\/strong> \u2014 it was sufficient to provide a simple <strong>statement of development intent<\/strong>, which did <strong>not<\/strong> include critical information such as <strong>red lines<\/strong> or <strong>development control lines<\/strong>.<\/p>\n\n\n\n<p>In my opinion, the responsibility for providing such technical data \u2014 especially when it is not publicly accessible \u2014 should still lie with the <strong>local departments of urban planning and architecture<\/strong>. However, the legislator has decided otherwise: <strong>the applicant is now responsible<\/strong> for including this information in the submitted scheme.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Should you include structures that you may build later \u2014 or might not build at all?<\/strong><\/h3>\n\n\n\n<p>I recommend including <strong>all structures<\/strong> you are considering \u2014 even those you only <em>might<\/em> build in the future \u2014 in the initial <strong>site development scheme<\/strong>.<\/p>\n\n\n\n<p>Constructing only <strong>some<\/strong> of the structures shown in the scheme <strong>does not violate<\/strong> current legislation. However, if you later decide to add any new buildings or structures that were <strong>not included<\/strong> in the original scheme, you will need to formally <strong>amend the building passport<\/strong> \u2014 and that process is almost identical to applying for a <strong>new<\/strong> one.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>On Distances to Adjacent Property Boundaries and Nearby Structures<\/strong><\/h3>\n\n\n\n<p>It is critically important to <strong>accurately indicate <\/strong><a href=\"https:\/\/dreamdim.ua\/uk\/vidstani-mizh-budynkamy-2024\/\" title=\"\"><strong>distances<\/strong> to the boundaries of neighboring land plots, as well as to any nearby <strong>buildings and structures<\/strong><\/a>, because many of these distances are <strong>legally regulated<\/strong>. There are <strong>minimum permissible distances<\/strong> established by law, and failure to comply with them may result in <strong>denial<\/strong> of your building passport application.<\/p>\n\n\n\n<p>\ud83d\udccc It is essential to understand that this requirement applies not only to <strong>existing structures<\/strong> on neighboring plots (or those already under construction), but also to those that are <strong>only planned<\/strong> \u2014 provided that your neighbors have <strong>obtained the legally required documentation<\/strong>, such as a <strong>building passport<\/strong>, <strong>development intent scheme<\/strong>, or other relevant construction permits.<\/p>\n\n\n\n<p>Information about <strong>planned buildings and structures<\/strong> on adjacent plots is available from <strong>local departments of urban planning and architecture<\/strong>, which are responsible for issuing or approving building passports or <strong>Urban Planning Conditions and Restrictions (UPCR)<\/strong> for land development.<\/p>\n\n\n\n<p>Since <strong>autumn 2020<\/strong>, such data has gradually begun to appear on the national online platform: <a class=\"\" href=\"https:\/\/e-construction.gov.ua\">e-construction.gov.ua<\/a><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p>The fact that an adjacent land plot is currently <strong>vacant<\/strong> does <strong>not<\/strong> mean that no construction is planned on it \u2014 and it certainly does not give you the right to <strong>build as close as 1 or even 5 meters<\/strong> from the boundary without consequences.<br>There are many situations where neighboring landowners have already received <strong>building passports<\/strong>, <strong>Urban Planning Conditions and Restrictions (UPCR)<\/strong>, or have <strong>registered Development Intent Schemes<\/strong> that allow construction <strong>just 1 meter<\/strong> away from your property line.<\/p>\n\n\n\n<p>Therefore, in most cases, to avoid violating legal requirements \u2014 especially those concerning <strong>fire safety setbacks<\/strong> \u2014 you will need to <strong>maintain a distance of 7 meters<\/strong> or more from the boundary when placing your building.<\/p>\n\n\n\n<p>This is <strong>one of the key reasons<\/strong> why obtaining all the required planning and permitting documentation <strong>before<\/strong> starting construction is essential.<\/p>\n\n\n\n<p>\ud83d\udcd0 <em><strong><a href=\"https:\/\/dreamdim.ua\/uk\/vidstani-mizh-budynkamy-2024\/\" title=\"\">Distances Between Buildings, Setbacks, and Fire Safety Gaps (2024)<\/a><\/strong><\/em><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>List of Documents Required to Obtain a Building Passport<\/strong><\/h3>\n\n\n\n<p>According to <strong>Clause 2.1 of the <a href=\"http:\/\/zakon5.rada.gov.ua\/laws\/show\/z0902-11\" title=\"\">Procedure for Issuing a Building Passport for Land Development<\/a><\/strong>, the following documents are required:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Application<\/strong> for the issuance of a building passport (or for amendments to an existing building passport);<\/li>\n\n\n\n<li><strong>Copy of a document confirming ownership or use rights<\/strong> to the land plot, or a <strong>superficies agreement<\/strong>, or a <strong>will<\/strong>, in cases where the real property right is not registered in the <strong>State Register of Property Rights to Real Estate<\/strong>;<\/li>\n\n\n\n<li><strong>Copy of a document confirming ownership<\/strong> of a real estate object located on the land plot, if the ownership right is not registered in the <strong>State Register of Property Rights to Real Estate<\/strong> (applicable in cases of reconstruction or major repairs);<\/li>\n\n\n\n<li><strong>Consent of co-owner(s)<\/strong> of the real estate object located on the land plot (in cases of reconstruction or major repairs), if the property is held in <strong>shared ownership<\/strong>;<\/li>\n\n\n\n<li><strong>Site development scheme<\/strong> (including location of buildings and structures on the land plot, distances to adjacent land plot boundaries and nearby structures, engineering networks and facilities, elevations and floor plans with dimensions, list of engineering systems including autonomous ones planned for use, etc.), using the <strong>template provided in Annex 2<\/strong> to the Procedure;<\/li>\n\n\n\n<li><strong>Project documentation<\/strong>, if available;<\/li>\n\n\n\n<li><strong>Consent of co-owner(s)<\/strong> of the land plot for the proposed construction (in case of new development), if the land is held in <strong>shared ownership<\/strong>;<\/li>\n\n\n\n<li><strong>Information about the presence<\/strong> of cultural heritage protection zones or any <strong>use restrictions<\/strong> within the land plot boundaries in the case of new construction (if applicable).<\/li>\n<\/ul>\n\n\n\n<p>Copies of documents submitted for the issuance of a building passport must be <strong>certified by the applicant (or their representative)<\/strong>. There is <strong>no requirement<\/strong> for notarization of these copies.<\/p>\n\n\n\n<p><strong>Notarized consents<\/strong> are required only when <strong>co-owners<\/strong> are involved. These consents are typically prepared in <strong>free form<\/strong>, but the <strong>signatures of all involved parties must be notarized<\/strong>.<\/p>\n\n\n\n<p>In most cases, when building under a building passport, a <strong>full construction project is not developed<\/strong>. Even if a project has been prepared (or purchased), I recommend submitting only <strong>design sketches<\/strong> (schematic drawings) to the urban planning and architectural authorities. Any demand for full project documentation for the purpose of issuing a building passport is <strong>unfounded<\/strong> and has <strong>no legal basis<\/strong>.<ins class=\"adsbygoogle\" style=\"display:block\" data-ad-format=\"fluid\" data-ad-layout-key=\"-fb+5w+4e-db+86\" data-ad-client=\"ca-pub-2601889031568289\" data-ad-slot=\"5406117927\"><\/ins><\/p>\n\n\n\n<p>\u2b55\ufe0f<strong><em>\u00a0\u00a0<\/em><\/strong>Despite the fact that the <strong>list of documents required to issue a building passport is exhaustive<\/strong>, urban planning and architectural authorities <strong>frequently demand additional documents<\/strong>, such as: extract from the <strong>settlement master plan<\/strong> or community development plan, <strong>topographic survey<\/strong>, <strong>charters of gardening or dacha cooperatives<\/strong>, <strong>extract from the State Land Cadastre<\/strong>, <strong>technical specifications<\/strong>, <strong>address assignment documents<\/strong>, and others. However, the <strong>Procedure for Issuing a Building Passport<\/strong> <strong>does not obligate the applicant to provide<\/strong> any of these documents.<\/p>\n\n\n\n<p>\ud83d\udcd0<strong><em><a href=\"https:\/\/dreamdim.ua\/uk\/parkan-ogorozha-2024\/\" title=\"\">Fence (Enclosure): Regulations, Requirements, Height Restrictions, and Permits \u2014 2024<\/a><\/em><\/strong><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Building Passport and the Unified State Electronic System in the Field of Construction (USEDCC)<\/strong><\/h3>\n\n\n\n<p>Since autumn 2020, <strong>information on building passports<\/strong> for land plot development must be entered into the <strong>Unified State Electronic System in the Field of Construction (USEDCC)<\/strong>.<\/p>\n\n\n\n<p>As a result, <strong>each building passport is assigned a unique USEDCC registration number<\/strong> (format: BP00:0000-0000-0000-0000) and a <strong>QR code is generated<\/strong>, linking directly to the passport on the public e-construction.gov.ua portal.<\/p>\n\n\n\n<p>\u2757\ufe0f<strong>If there is no registration number<\/strong>, or if <strong>the data entered into the USEDCC is incomplete or contains errors<\/strong>, it becomes <strong>impossible to register a Notice of Commencement of Construction Works<\/strong>!<\/p>\n\n\n\n<p>It is <strong>critically important to verify<\/strong> the accuracy of the information entered into the USEDCC. In my practice, I have encountered multiple cases where the data was incomplete or contained mistakes \u2014 which later resulted in the <strong>DIAM (formerly DABI) authority refusing to register the documents<\/strong> granting the legal right to begin construction.<\/p>\n\n\n\n<p>\u2705\u00a0 There is a <a href=\"https:\/\/dreamdim.ua\/uk\/ob-yekty-yaki-mozhna-buduvaty-bez-dozvolu\/\" title=\"\"><strong>specific list of construction works<\/strong> that <strong>do not require<\/strong> a building passport, permit documents, or commissioning procedures<\/a>. This list of exempted objects (more precisely, construction works) is defined by the <strong>Cabinet of Ministers of Ukraine Resolution No. 406<\/strong> dated <strong>June 7, 2017<\/strong>.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Grounds for Refusal to Issue a Building Passport<\/strong><\/h3>\n\n\n\n<p>Ukrainian law provides a <strong>limited and exhaustive list<\/strong> of grounds on which an authority may refuse to issue a building passport. According to <strong>Clause 2.4 of the Procedure<\/strong>, the package of documents for issuing or amending a building passport is returned by the <strong>authorized body of urban planning and architecture<\/strong> to the applicant in the following cases:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>failure to submit a complete set of required documents;<\/li>\n\n\n\n<li>inconsistency of the proposed land development plans with local urban planning documentation, construction norms, and regulations;<\/li>\n\n\n\n<li>submission by the applicant of a written request in free form to withdraw their application for a building passport.<\/li>\n<\/ul>\n\n\n\n<p>\ud83d\udccc<strong><em>\u00a0 <\/em><\/strong>In practice, <strong>most refusals<\/strong> to issue a building passport are based on the <strong>absence of urban planning documentation<\/strong> (such as a master plan, detailed plan of territory [DPT], etc.) or <strong>non-compliance<\/strong> of the submitted documents (especially the design intentions) with the <strong>current urban planning legislation<\/strong>.<\/p>\n\n\n\n<p>It is strongly recommended to <strong>check the possibility<\/strong> of obtaining a building passport and placing specific buildings or structures on a land plot <strong>before purchasing the land<\/strong>.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Timeframe for Issuance of a Building Passport<\/strong><\/h3>\n\n\n\n<p>According to Clause 2.1 of the Procedure, a <strong>building passport must be issued free of charge<\/strong> by the <strong>authorized urban planning and architecture body<\/strong> within <strong>ten business days<\/strong> from the date of submission of the complete package of documents.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Right to Commence Construction Work<\/strong><\/h3>\n\n\n\n<p>After obtaining a building passport, to <strong>gain the legal right to carry out construction<\/strong>, the applicant must <strong>submit a notice of commencement of construction work<\/strong> to the <strong>relevant body of state architectural and construction control<\/strong> (DIAM, formerly DABI), <strong>for projects being built based on a building passport<\/strong>.<\/p>\n\n\n\n<p>\u2705&nbsp;The notice can be submitted <strong>in paper form<\/strong> via the Administrative Services Center (CNAP) or by <strong>postal mail<\/strong>, but it is much faster and more convenient to <strong>submit it electronically via the Diia portal<\/strong>.<\/p>\n\n\n\n<p>Currently, in most cases, <strong>automatic registration<\/strong> of the submitted notice is available (only if construction is based on a <strong>building passport<\/strong>, not a development intention scheme). This means you will typically receive the <strong>registration number<\/strong> for your notice of commencement <strong>within minutes<\/strong>.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><em>For advice on specific cases or discussion of current norms regarding building passports or development intention schemes, you can join the <strong><a href=\"https:\/\/www.facebook.com\/groups\/urban.ukraine\/\" title=\"\">Urban Planning in Ukraine<\/a><\/strong> community group.<\/em><\/p>\n\n\n\n<p><em><a href=\"https:\/\/www.facebook.com\/groups\/218794585535566\">Yuriy Brykaylo<\/a><\/em>,<\/p>\n\n\n\n<p><em><a href=\"https:\/\/dreamdim.ua\/\">DREAMDIM<\/a>&nbsp;&#038;&nbsp;<a href=\"https:\/\/urbandata.online\/\">URBANDATA<\/a><\/em><\/p>\n\n\n\n<p><em>\u24b8 2025<\/em><\/p>\n<!-- AddThis Advanced Settings generic via filter on the_content --><!-- AddThis Share Buttons generic via filter on the_content -->","protected":false},"excerpt":{"rendered":"<p>Anyone planning to build a private house\u2014whether a homestead, garden, or summer house\u2014inevitably asks: what is required to start construction and ensure everything is done legally? If the total area of your planned house does not exceed 500 square meters, and the building will not be taller than two stories and an attic, then you &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/dreamdim.ua\/en\/budivelnyj-pasport-2025\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Building Passport for Land Plot Development in 2025&#8221;<\/span><\/a><\/p>\n<p><!-- AddThis Advanced Settings generic via filter on get_the_excerpt --><!-- AddThis Share Buttons generic via filter on get_the_excerpt --><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-8760","post","type-post","status-publish","format-standard","hentry","category-articles"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/dreamdim.ua\/en\/wp-json\/wp\/v2\/posts\/8760","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dreamdim.ua\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dreamdim.ua\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dreamdim.ua\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/dreamdim.ua\/en\/wp-json\/wp\/v2\/comments?post=8760"}],"version-history":[{"count":41,"href":"https:\/\/dreamdim.ua\/en\/wp-json\/wp\/v2\/posts\/8760\/revisions"}],"predecessor-version":[{"id":9118,"href":"https:\/\/dreamdim.ua\/en\/wp-json\/wp\/v2\/posts\/8760\/revisions\/9118"}],"wp:attachment":[{"href":"https:\/\/dreamdim.ua\/en\/wp-json\/wp\/v2\/media?parent=8760"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dreamdim.ua\/en\/wp-json\/wp\/v2\/categories?post=8760"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dreamdim.ua\/en\/wp-json\/wp\/v2\/tags?post=8760"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}