{"id":9238,"date":"2025-08-16T20:01:43","date_gmt":"2025-08-16T18:01:43","guid":{"rendered":"https:\/\/dreamdim.ua\/en\/?p=9238"},"modified":"2025-08-16T20:01:44","modified_gmt":"2025-08-16T18:01:44","slug":"installation-of-rooftop-and-facade-solar-power-plants-no-permit-required-draft-amendments-proposed","status":"publish","type":"post","link":"https:\/\/dreamdim.ua\/en\/installation-of-rooftop-and-facade-solar-power-plants-no-permit-required-draft-amendments-proposed\/","title":{"rendered":"Installation of rooftop and facade solar power plants no permit required (draft amendments proposed)"},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/dreamdim.ua\/wp-content\/uploads\/2025\/08\/DREAMDIM_solar_2025_en-1024x576.png\" alt=\"\" class=\"wp-image-9234\" srcset=\"https:\/\/dreamdim.ua\/wp-content\/uploads\/2025\/08\/DREAMDIM_solar_2025_en-1024x576.png 1024w, https:\/\/dreamdim.ua\/wp-content\/uploads\/2025\/08\/DREAMDIM_solar_2025_en-300x169.png 300w, https:\/\/dreamdim.ua\/wp-content\/uploads\/2025\/08\/DREAMDIM_solar_2025_en-768x432.png 768w, https:\/\/dreamdim.ua\/wp-content\/uploads\/2025\/08\/DREAMDIM_solar_2025_en.png 1200w\" sizes=\"auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p>Currently, legislation in Ukraine contains inconsistencies regarding the permitting requirements for installing rooftop and facade solar power plants (SPPs). To address this, the Ministry for Development of Communities and Territories of Ukraine has prepared a draft resolution of the Cabinet of Ministers of Ukraine (CMU) \u201cOn amendments to the list of construction works that do not require permitting documents and after completion of which the object is not subject to commissioning\u201d. The goal of this draft is to simplify permitting procedures for placing solar power facilities.<\/p>\n\n\n\n<p><strong>Do rooftop and facade SPPs require a permit?<\/strong><\/p>\n\n\n\n<p>As of today, under Part 19 of Article 96 of the Law of Ukraine \u201cOn Alternative Energy Sources\u201d, the installation of rooftop solar power plants may be carried out without obtaining construction permits.<\/p>\n\n\n\n<p>On the one hand, this provision allows rooftop SPPs to be installed without permits; on the other hand, the wording \u201cmay be carried out\u201d creates practical uncertainty.<\/p>\n\n\n\n<p><em>\u2757\ufe0fIn addition, the law refers only to rooftop SPPs, there is no mention at all of solar plants installed on facades.<\/em><\/p>\n\n\n\n<p>To justify the absence of permit requirements, in addition to citing the Law \u201cOn Alternative Energy Sources,\u201d developers often refer to<a href=\"https:\/\/zakon.rada.gov.ua\/laws\/show\/406-2017-%D0%BF\/ed20250415#Text\" title=\"\"> CMU Resolution No. 406<\/a>, which contains a List of construction works that do not require permitting documents. This list includes reconstruction of power and low-voltage systems that ensure the functioning of buildings and structures (previously, it also explicitly included \u201ctechnical re-equipment\u201d).<\/p>\n\n\n\n<p>However, Resolution No. 406 does not explicitly indicate that installation works for rooftop or facade SPPs can be performed without permits.<\/p>\n\n\n\n<p><strong><em>\u2705 <a href=\"https:\/\/dreamdim.ua\/uk\/shho-mozhna-buduvaty-bez-dozvilnyh-dokumentiv\/\" title=\"\">What can be built without permits?<\/a> (<a href=\"https:\/\/www.youtube.com\/@DREAMDIM_UA\/videos\" title=\"\">video available here<\/a>)<\/em><\/strong><\/p>\n\n\n\n<p>Thus, at present we cannot unequivocally state that rooftop SPPs do not require a permit, as the matter remains legally unsettled. And with respect to facade-mounted panels, the uncertainty is even greater.<\/p>\n\n\n\n<p>The fact that the Ministry has prepared the above-mentioned draft resolution further confirms that there are many disputes and challenges regarding permitting documents for rooftop and facade SPPs, and that these issues need to be resolved.<\/p>\n\n\n\n<p><strong>What does the Ministry propose?<\/strong><\/p>\n\n\n\n<p>In my view, the Ministry has chosen the right and most effective path \u2014 to amend the list of construction works that do not require permitting documents and after completion of which the object is not subject to commissioning.<\/p>\n\n\n\n<p><a href=\"https:\/\/mindev.gov.ua\/storage\/app\/sites\/1\/uploaded-files\/11-proekt-zmin.pdf\" title=\"\">The proposed amendments<\/a> aim to simplify permitting procedures for such facilities and eliminate disputes and inconsistencies related to permitting requirements.<\/p>\n\n\n\n<p>\u2b55\ufe0f Specifically, <strong>the draft proposes expanding the scope of the List of exempted works to include the installation of solar power plants on rooftops and facades, as well as replacement of equipment in such plants<\/strong>.<\/p>\n\n\n\n<p>\u2b55\ufe0f At the same time, the draft provides that such works shall be carried out based on a structural inspection of commissioned buildings and the presence of an inspection report prepared by a certified professional. This report should include recommendations regarding the feasibility of carrying out such works.<\/p>\n\n\n\n<p>However, for individual residential houses, garden or country houses, as well as auxiliary buildings and structures, conducting such inspections and obtaining a report is at the discretion of the owner.<\/p>\n\n\n\n<p>\u2b55\ufe0f Therefore, <strong>for rooftop and facade installations on private houses, garden houses, or auxiliary buildings, neither an inspection report nor permitting documents will be required.<\/strong><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><em>For more news and analysis in the field of urban planning and land law, join the community <a href=\"https:\/\/www.facebook.com\/groups\/urban.ukraine\/\" title=\"\">Urban Planning in Ukraine<\/a> and follow my <a href=\"https:\/\/www.youtube.com\/@DREAMDIM_UA\" title=\"\">YouTube channel<\/a>.<\/em><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><em><a href=\"https:\/\/www.facebook.com\/groups\/218794585535566\">Yuriy Brykaylo<\/a><\/em>,&nbsp;<em>attorney<\/em><\/p>\n\n\n\n<p><em><a href=\"https:\/\/dreamdim.ua\/\">DREAMDIM<\/a>&nbsp;&#038;&nbsp;<a href=\"https:\/\/urbandata.online\/\">URBANDATA<\/a><\/em><\/p>\n\n\n\n<p><em>\u24b8 2025<\/em><\/p>\n<!-- AddThis Advanced Settings generic via filter on the_content --><!-- AddThis Share Buttons generic via filter on the_content -->","protected":false},"excerpt":{"rendered":"<p>Currently, legislation in Ukraine contains inconsistencies regarding the permitting requirements for installing rooftop and facade solar power plants (SPPs). To address this, the Ministry for Development of Communities and Territories of Ukraine has prepared a draft resolution of the Cabinet of Ministers of Ukraine (CMU) \u201cOn amendments to the list of construction works that do &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/dreamdim.ua\/en\/installation-of-rooftop-and-facade-solar-power-plants-no-permit-required-draft-amendments-proposed\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Installation of rooftop and facade solar power plants no permit required (draft amendments proposed)&#8221;<\/span><\/a><\/p>\n<p><!-- AddThis Advanced Settings generic via filter on get_the_excerpt --><!-- AddThis Share Buttons generic via filter on get_the_excerpt --><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-9238","post","type-post","status-publish","format-standard","hentry","category-articles"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/dreamdim.ua\/en\/wp-json\/wp\/v2\/posts\/9238","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dreamdim.ua\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dreamdim.ua\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dreamdim.ua\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/dreamdim.ua\/en\/wp-json\/wp\/v2\/comments?post=9238"}],"version-history":[{"count":2,"href":"https:\/\/dreamdim.ua\/en\/wp-json\/wp\/v2\/posts\/9238\/revisions"}],"predecessor-version":[{"id":9240,"href":"https:\/\/dreamdim.ua\/en\/wp-json\/wp\/v2\/posts\/9238\/revisions\/9240"}],"wp:attachment":[{"href":"https:\/\/dreamdim.ua\/en\/wp-json\/wp\/v2\/media?parent=9238"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dreamdim.ua\/en\/wp-json\/wp\/v2\/categories?post=9238"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dreamdim.ua\/en\/wp-json\/wp\/v2\/tags?post=9238"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}